Berkley-Dighton Bridge Replacement

Demolition of the existing bridge substructure and temporary bridge. Construction of a 4-span precast concrete arch bridge measuring 350 feet, including spandrel walls and highway construction over the Taunton River.

Previous
Previous

Tyngsboro Bridge Reconstruction

Next
Next

Hillview Country Club Demolition